Road & Transport

DESIGN REVIEW AND CONSTRUCTION SUPERVISION OF THE PERIODIC MAINTENANCE OF 154.4KM OF THE MUTANDA JUNCTION TO KASEMPA ROAD IN NORTHWESTERN PROVINCE

Map of the Country where the project took place
Client:
RDA - Road Development Agency
Date:
2017 – On going
Value of Services:
600,000 USD
Funded by:
National Road Fund Agency

The project road starts from the M008/T005 Mutanda Junction in Solwezi District and goes along M008 to Kasempa Turn-off onto Road D181 to Kasempa Road. It is estimated at a total distance of 154.4 km. The project will be implemented within the RDA’s policy of out-sourcing consultancy services for engineering designs. The scope of work includes but not limited to:

  • Reconstruction of selected sections;
  • Pothole Patching and Shoulder Repairs;
  • Double Surface Dressing application;
  • Ancillary road works.
  • Rehabilitation and widening works of roads.

The project included the following Drainage Infrastructures: (i) Road surface drainage with the drainage of stormwater runoff; (ii) Subsurface drainage with the interception and disposal of groundwater flows; (iii) Erosion protection measures for the slopes.

No items found.
< Go back