DETAILED ENGINEERING DESIGN AND CONSTRUCTION SUPERVISION OF GAUTENG FREEWAY IMPROVEMENT PROJECT (GFIP): WORK PACKAGE F/N3 - SECTION BETWEEN THE GELDENHUYS AND BUCCLEUCH INTERCHANGES (KM 25,0 TO 42,6)
Client:
South African National Roads Agency
Date:
2008 – 2011
Value of Services:
3,000,000 USD
Funded by:
Local Funds
The design includes:
- Drainage, Earthworks and pavement layers, asphalt pavement and seals including CRCP, all ancilliary roadworks and structures
The contract supervision includes:
- Contract management and head office supervision, site supervision and Quality Control and Management of joint laboratory
Activities:
- Detailed Design; (field surveys; topographical investigations, soils and materials investigations, engineering drawings, etc);
- Environmental Impacts Assessment, Inception Report; Draft Design Report;
- Supervision of the Works Contract to ensure that the works comply with the approved design, drawings, specifications, conditions of contract and sound engineering practice;
- Undertake classified traffic count during the Construction period, prepare comprehensive report on the ESMP and provide annual report on measures adopted for the safety of project roads, sensitization of local population on HIV/AIDS, STI, TB and Gender issues;
- Preparation of final construction report and as built drawings of all completed works;
- Supervision of maintenance activities during the defects liability period;
Preparation of the Project Completion Report (PCR).