ECUADOR - FEASIBILITY, ENVIRONMENTAL IMPACT AND FINAL DESIGN FOR THE BALZAR-LA TRAMPA-OLMEDO ROAD, LOCATED IN THE PROVINCES OF GUAYAS AND MANABI
Client:
Ministry of Transports & Public Works
Date:
2011 - 2012
Value of Services:
1,150,000 USD
Funded by:
Inter-American Development Bank
Detail design of a dual-way road with the following characteristics:
- Length Balzar- Olmedo: 38.143Km
- Length Access “La Trampa”: 1,851m
- Total length: 40Km
- Type of road: Class III
- Topography: Flat-wavy feature
- Cross Section: 6.70m plus 2m shoulder
- Type of Rolling: Asphalt Layer
- Section in Bridges: 12,70m
- Structures: 11
- Transverse drains: 98
The project also included the following Drainage Infrastructures: (i) Road surface drainage with the drainage of stormwater runoff; (ii) Subsurface drainage with the interception and disposal of groundwater flows; (iii) Erosion protection measures for the slopes.