FEASIBILITY STUDY AND DETAILED ENGINEERING DESIGN FOR HIGHWAY FOR THE GROUP I, GIRARDOT – PUERTO SALGAR – HONDA

Map of the Country where the project took place
Client:
ACCIONA INFRAESTRUCTURAS
Date:
2013 - 2014
Value of Services:
2013 - 2014
Funded by:
Local Funds

The routes covered by this tender have an estimated 208 kilometers source destination and its route crosses the departments of Tolima, Caldas and Cundinamarca total length.

Variant Flanders – Girardot section: this section has a length of 5.2 kilometers, and has sections of new track and stretches of improvement in the initial and final connections, involves the construction of 1 bridge over the Magdalena river and two overpasses exchangers involving the construction of a series of structures of new bridges.

Girardot – Guataquí section: this section has a length of 36.5 kilometers and corresponds to the construction of a road to improvement. Within the scope envisaged is the construction of two pedestrian overpasses and rebuild several bridges and / or new design along the stretch.

Guataquí – Cambao section: this section has a length of approximately 51 kilometers and corresponds to the construction of a road to improvement. It includes a type intersection roundabout construction of a pedestrian overpass and several bridges to rebuild and / or new design along the stretch.

Cambao- Puerto Bogotá section: this section has a length of 47.8 kilometers, and has new sections and sections of road improvement, considers the construction of four at-grade intersections, as well as several bridges to rebuild.

Honda – La Dorada section: this section has a length of approximately 57 kilometers, and has new sections and sections of road improvement, considers the construction of four at-grade intersections, as well as several bridges to rebuild and / or new design along the stretch. Notably, the new bridge over the Magdalena River 320 m span.