CONSULTANCY SERVICES FOR DETAILED DESIGN AND CONSTRUCTION SUPERVISION OF (A) BUNDIBUGYO WATER SUPPLY AND SANITATION SYSTEM; (B) DESIGN REVIEW AND CONSTRUCTION SUPERVISION OF KYENJOJO – KATOKE WATER SUPPLY AND SANITATION SYSTEM (ASSIGNMENT 1)
The WSDF-C provides technical and financial support to help districts and Town Councils to develop, rehabilitate and expand water supply services and sanitation in the small towns and rural growth centres, following a demand based approach under the framework of Uganda’s water and sanitation policies and relevant sector strategies. The project area comprise of Kagadi town (Lot 4), located in Kibaale District; Bugoigo-Walukuba township (Lot 2) located in Buliisa District; and Zigoti-Ssekanyoni township (Lot 9), located in Mityana District.
Kigadi Town: the town covers a land area of 35km2 and has an estimated 37,000 people. The services areas includes the township of Ruterete which is approximately six (6) from Kagadi town, with a population pf about 6,000 people.
The proposed supply is a surface water treatment and transmission, approx.. 700m3 storage and 60 km pipe network.
Bugoigo-Walukuba: population of about 7,426 people. There is an existing surface water supply system of insufficient capacity serving ony Butiaba town. The works will improve the treatment and expand the storage and distribution network. The works also include rehabilitation measures in Butiaba town.
Zigoti-Sisekanyonyi: population of about 14,000 people.