CONSULTANCY SERVICES FOR DETAILED DESIGN AND CONSTRUCTION SUPERVISION OF (A) BUNDIBUGYO WATER SUPPLY AND SANITATION SYSTEM; (B) DESIGN REVIEW AND CONSTRUCTION SUPERVISION OF KYENJOJO – KATOKE WATER SUPPLY AND SANITATION SYSTEM (ASSIGNMENT 1)
Detailed design and construction supervision of Bundibugyo water supply and sanitation system, and design review and construction supervision of Kyenjojo-Katoke water supply and sanitation system.
The Bundibugyo Town Council is located in Bundibugyo District approximately 356km west of Kampala City. The town had a population of approximately 30,000 people in 2015. The town has a gravity flow piped water supply system, constructed in the 1970’s, which is not sufficient for the current demand. A new proposed water supply system, serving areas including Bundibugyo Town Council and the surrounding villages shall be implemented. The proposed water supply system is designed to serve approximately 79,010 people in 2040. The system is based on gravity flow of water from River Tokwe with a production of approx. 2,500m3/d. The total length of the transmission main is 10km and a total of 100km of distribution pipelines. The total water storage is 450m3.
Sanitation interventions include environmentally friendly on-site sanitation facilities for approximately 05 No. institutions/schools in the project area. For the Kyenjojo-Katoke towns the water supply area of the water supply and sanitation scheme covers the Town councils of Katooke and Kyenjojo in Kyenjojo District. The current population in the water supply area is 22,792 people. The water supply area includes the entire Town councils of Katooke and Kyenjojo, in addition, the water supply and sanitation scheme serve other trading centres along the pipeline route that include Nyakiisi, Munjeru, Mwikoona, Nyamwandara, Kaiganga, Rwamukora (Along the Katooke-Kyenjojo route).