FEASIBILITY STUDY AND DETAILED DESIGNS FOR WATER SUPPLY AND SANITATION SYSTEM ALONG KIVU BELT

The principal objective of the project is 100% access to clean water supply. The proposed project will also contribute to enhanced hygiene and sanitation hence reduction of water borne diseases. This will also contribute towards alleviation of poverty within the area through the improvement of socio-economic activities in target.
The project will develop feasibility studies, developing the most cost-effective detailed studies in concept to achievement 100% access to clean water and adequate sanitation in these areas and developing final designs with drawings, construction details, cross-sections, final quantities, costs, technical specifications, tender documents, operating manuals, and health and safety plans. The design will be carried out in accordance with government design guidance typically used for waterworks and other public infrastructure facilities, as well as other applicable design criteria. The project area is in Rutsiro, Karongi and Nyamasheke Districts